Kostenüberschreitungen durch manuelle Bearbeitung von Change Requests
Definition
IT change and order management requires collecting information, assessing impact, preparing documentation, routing for approval, and updating plans and budgets.[1][3][4][6] Vendors of order management and change tools explicitly position automation as a way to "reduce the manual steps needed"[3] and "optimise order workflows" to improve accuracy and efficiency.[3][4][6] Logic-based inference: In a typical mid-size IT project, change processing often involves a project manager (1–2 hours), solution architect (2–4 hours), and governance meetings (1–2 hours) per significant change, plus finance updates, totalling 6–10 hours per change event. For 5–10 material changes per project, this is 30–100 hours of mainly non-billable or discounted time. At an average fully loaded internal cost of AUD 120/hour for senior staff, this implies AUD 3,600–12,000 extra internal cost per project driven by manual handling. Automation platforms indicate that streamlined workflows and automated approvals can "significantly" reduce such manual effort and downtime.[1][3][6] Assuming a conservative 50 % efficiency gain from tooling, IT firms could avoid AUD 1,800–6,000 in avoidable internal cost per project.
Key Findings
- Financial Impact: Quantified (logic-based): ~30–100 Stunden zusätzlicher interner Aufwand je Projekt für manuelle Change-Order-Bearbeitung (~AUD 3,600–12,000 interne Kosten), of which 50 % (~AUD 1,800–6,000) is addressable by automation.
- Frequency: Recurring on every medium-to-large project with multiple formal changes; continuous in managed services environments with frequent small changes.
- Root Cause: Fragmented tools (email, spreadsheets, ticketing) for change handling; lack of templates; no integration between project, finance, and order systems; over-reliance on meetings for approvals.
Why This Matters
The Pitch: IT System Design Services providers in Australia 🇦🇺 waste 20–40 Stunden pro Projekt allein auf die manuelle Bearbeitung von Change Orders. Workflow-Automatisierung and system integration can cut this by 50–70 %, reducing overtime and freeing billable capacity.
Affected Stakeholders
Project Manager, Solution Architect, Change Manager, Service Delivery Manager, Finance/Controlling
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Get Solutions for This Problem
Full report with actionable solutions
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Related Business Risks
Unbezahlte Change Requests durch fehlende schriftliche Nachträge
Nachbesserungskosten durch fehlerhafte oder unvollständig dokumentierte Change Orders
Verzögerter Zahlungseingang durch schleppende Genehmigung von Change Orders
Kapazitätsverlust durch Engpässe im Change-Approval-Prozess
Kundenfriktion und Projektabbrüche durch intransparente Change-Order-Abwicklung
Fehlentscheidungen wegen fehlender Transparenz über kumulierte Change-Kosten
Request Deep Analysis
🇦🇺 Be first to access this market's intelligence