Dokumentations- und Transparenzpflichten nach § 14a EnWG (Grid Data Compliance Burden)
Definition
Grid operators must maintain and publish granular data on network congestion, control measures (Regelmaßnahmen), duration, and scope. Failure to comply transparently or within regulatory timelines exposes operators to audit findings by Bundesnetzagentur and potential corrective action orders. The shared internet platform requirement introduces integration friction and manual data migration costs.
Key Findings
- Financial Impact: €6,000–12,000/year per operator; 40–60 hours/month manual compliance work; risk of audit escalation (no published fine quantum, but typical Bundesnetzagentur corrective orders = 6–18 month remediation projects costing €50,000–200,000)
- Frequency: Continuous (monthly reporting cycle); annual audit cycles
- Root Cause: Lack of integrated IT systems linking substation SCADA, grid management platforms, and regulatory reporting portals. Manual data extraction, validation, and transformation.
Why This Matters
This pain point represents a significant opportunity for B2B solutions targeting Electric Power Transmission, Control, and Distribution.
Affected Stakeholders
Grid Operations Manager, Compliance Officer, IT/Systems Integration Lead, Regulatory Affairs
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Get Solutions for This Problem
Full report with actionable solutions
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Related Business Risks
Redispatch 2.0 Abrechnungs- und Ausgleichskomplexität (Redispatch Accounting Complexity)
Netzinfrastruktur-Modernisierungsverzögerungen und temporäre Lösungskosten (Substation Modernization Bottlenecks & Temporary Solution Costs)
Neue Haftungsregeln und Netzanschlussverordnungs-Übergangsfriktion (Operator Liability & Grid Connection Transition Risk)
NIS2-Bußgelder und Betriebsunterbrechungen durch mangelnde Incident Response
Manuelle Feasibility-Studien und hohe Bearbeitungskosten
Strafzahlungen für Nicht-Einhaltung der 24-Stunden-Lieferantenwechsel-Frist
Request Deep Analysis
🇩🇪 Be first to access this market's intelligence