सामग्री सत्यापन बोतल की गर्दन और परियोजना विलंब (Material Verification Bottleneck & Project Delays)
Definition
Material acceptance verification is manual and non-digital. Site supervisors must: (1) receive materials, (2) manually request BIS/test certificates from supplier, (3) cross-check batch numbers/quantities, (4) verify against purchase order, (5) log into asset system. Average cycle time: 3–5 days per shipment. During this period, materials remain offsite, crew cannot work, and daily project cost accumulates.
Key Findings
- Financial Impact: ₹10,000–₹15,000 crew idle cost per day × 3–5 days per shipment = ₹30,000–₹75,000 per shipment. Typical project: 20–30 shipments = ₹600,000–₹2,250,000 total delay cost. (Utility projects: ₹5–₹50 crore budgets; 1–2% cost overrun = ₹50,000–₹1,000,000.)
- Frequency: Every material delivery (10–50 per project); typical project duration 6–18 months.
- Root Cause: No digital material traceability system; paper-based certificates; manual matching of batch numbers; no real-time visibility into supplier compliance status.
Why This Matters
The Pitch: Utility system construction projects in India lose ₹50,000–₹200,000 per 10-day delay due to manual material verification. Digital traceability (QR codes + blockchain linking supplier → BIS cert → test lab → site) reduces verification to <2 hours per shipment.
Affected Stakeholders
Site Supervisor, Project Manager, Material Coordinator, Quality Inspector
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Get Solutions for This Problem
Full report with actionable solutions
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Related Business Risks
BIS अनुपालन विफलता और प्रतिबंध आदेश (BIS Compliance Failure & Prohibition Orders)
गुणवत्ता परीक्षण लागत और अनुपालन दोहराव (Quality Testing Cost Overruns & Compliance Duplication)
पर्यावरण अनुपालन जुर्माना (Environmental Compliance Fines)
अनिवार्य अनुपालन उपायों की अतिरिक्त लागत (Mandatory Compliance Cost Overruns)
पर्यावरणीय मंजूरी विलंब (Environmental Clearance Delays)
Request Deep Analysis
🇮🇳 Be first to access this market's intelligence