Definition

NTSB’s SCADA study documents multiple incidents where controllers misread SCADA data, assumed power or equipment issues instead of leaks, and delayed shutdowns, significantly increasing spill volumes. Larger releases drive higher cleanup, third‑party damage, and environmental remediation costs, which are classic Cost of Poor Quality outcomes for leak detection performance.

Key Findings

  • Financial Impact: In one documented case, the controller’s failure to determine from SCADA that a leak had occurred contributed to a release of about 564,000 gallons of gasoline, escalating remediation, property damage, and environmental costs well beyond the cost of the failed component itself.[1] Similar SCADA‑related deficiencies across other accidents in the NTSB study indicate multi‑million‑dollar incremental quality‑failure costs industry‑wide.
  • Frequency: Occasional per operator but recurring across the industry; the NTSB report aggregates several serious accidents where SCADA monitoring and controller performance were identified as contributing factors, indicating a systemic pattern.[1]
  • Root Cause: Poor SCADA display design (e.g., no easy visualization of historical trends), inadequate alarm management, and insufficient controller training and fatigue management reduce operators’ ability to correctly diagnose leaks from SCADA data, allowing incidents to escalate.[1][6]

Why This Matters

This pain point represents a significant opportunity for B2B solutions targeting Pipeline Transportation.

Affected Stakeholders

Pipeline controllers/control room staff, SCADA and HMI engineers, Training and competency managers, Risk, safety, and environmental managers, Claims and legal teams

Deep Analysis (Premium)

Financial Impact

$0.3M - $3M per incident (PHMSA civil penalties $200K - $2M; system redesign and re-certification; legal fees; customer confidence loss; insurance underwriting issues) • $0.5M - $5M per incident (regulatory fines up to $2.5M per violation; legal defense; corrective action plan execution; potential criminal liability for grossly negligent oversight) • $1,000,000 - $5,000,000 per incident (third-party property remediation settlements, environmental liens, easement renegotiation costs, legal fees, property title remediation)

Unlock to reveal

Current Workarounds

Check instrument calibration records (email archive), contact maintenance to verify compressor/pump status (phone), review maintenance work orders, manually sample product at nearest access point, group email thread with eng team • Contact fuel gas supplier (separate company/phone call), check pressure regulator station logs, review turbine inlet conditions, email to operations, manual flow verification at bypass line • Contact supplier operations, check internal tank levels, review purchase orders for expected delivery, email to procurement, manual confirmation via phone

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Undetected or Late‑Detected Leaks Cause Lost Product Revenue Beyond Incident Damage

Example case: ~564,000 gallons of gasoline released in one SCADA‑monitored rupture; at a conservative $2/gal wholesale that is ~$1.1M in lost product in a single event, with NTSB noting similar SCADA‑related issues across multiple accidents, implying multi‑million‑dollar annualized exposure for large operators.[1]

High False‑Alarm Rates in SCADA/CPM Drive Unnecessary Field Callouts and Operational Waste

For a mid‑size operator with dozens of mainlines, a CPM false‑alarm rate that triggers just one unnecessary field investigation per week at ~$10,000–$20,000 (crew mobilization, line balance checks, temporary rate reductions) implies ~$0.5–$1M per year in avoidable operating cost; this is consistent with CPM guidance that emphasizes minimizing false alarms precisely due to their operational and cost impacts.[3]

Slow, Fragmented SCADA Data for Over‑Short Analysis Delays Revenue Reconciliation

Where over‑short detection depends on manual compilation of SCADA and tank‑level data, disputes over imbalances can delay settlement by weeks, effectively increasing DSO (days sales outstanding) and tying up millions in working capital on high‑throughput crude and product systems; CPM best‑practice documents explicitly promote automation of over‑short analysis to reduce these delays.[3]

Conservative Leak Detection Settings and SCADA Limitations Force Throughput Derates

A 5–10% derate on a large crude line moving 500,000 bpd at a $3–$5/bbl tariff equates to $27M–$91M in annual lost tariff revenue; CPM best‑practice documents caution that sensitivity to flow conditions and configuration must be evaluated per line, which in practice leads operators to accept lower capacity to maintain leak detection reliability.[3]

Regulatory Findings on SCADA, Alarm Management, and Control Rooms Drive Costly Remediation and Potential Fines

While individual fine amounts vary by case, PHMSA has authority to levy significant civil penalties per violation per day; in addition, mandated SCADA upgrades, training programs, and leak detection improvements (e.g., implementing API RP 1165‑compliant displays and enhanced CPM) typically run into the hundreds of thousands to millions per operator over multi‑year compliance programs.[1][6][7]

Limited Direct Evidence of Fraud via SCADA in Leak Detection, But Weak Monitoring Increases Abuse Risk

Not quantifiable from current evidence for SCADA‑specific fraud in leak detection workflows.